San Diego International Airport (SAN)
San Diego, CA
New Terminal 1
Project Highlights:
- New Terminal 1 outbound and inbound baggage handling system
- New 4+2 Checked Baggage Inspection System (CBIS)
- Issue-free TSA submittals
Project Description:
San Diego County Regional Airport Authority (SDCRAA) commissioned the design and construction of a new Terminal 1 at San Diego International Airport (SAN) to replace the existing Terminal 1, which was decommissioned and demolished once airport and airline operations were transferred to the new terminal. The new Terminal processes and house all existing Terminal 1 operations for all outbound and inbound.
As a member of the baggage handling system (BHS) Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provided BHS and TSA subject matter expertise and design oversight for the new Terminal 1 BHS and an integrated the Checked Baggage Inspection System (CBIS), housed in a greenfield site comprising inbound, outbound and transfer BHS. The scope of services included:
- Oversight of all BHS & CBIS design for TSA compliance.
- TSA submittal preparation including BHS designer/OEM support to ensure TSA PGDS CBIS design and submittal compliance.
- Development of the Basis of Design Report (BDR).
- Flight schedule analysis/verification.
- Development of Contingency and Configuration Management Plans.
- Development of Life Cycle Cost Analysis (LCCA).
- Commissioning support.